Harbour City, Lin-gang Special Area, Shanghai

Top tier large scale park building complex lighting

Project Location | Shanghai Port City Plaza
Construction Time | 2023

As of October 2020, the built-up area of Lingang New Area is 63 square kilometers. Before the establishment of the pilot free trade zone in the Lingang area, TS Ruosi Lighting began to participate in the construction of the Port City Square. After nearly 6 years, TS was responsible for the lighting design of the Port City Square project, phases one, two, and three, which have been completed. During this period, the TS team was also responsible for the overall lighting planning of the Dishui Lake Vitality Block. The area of the completed project with lights on is so large that it can be said to be the largest single project completed in the Lingang New Area. The total construction area of Gangcheng Square is 560000 square meters, consisting of 8 plots of land to form a complete block complex Mr. Zhong Ming, the chief designer of TS, said, “In the current top-level large-scale park building complex, how to use light at night to highlight the culture of the enterprise, the openness of the area, and the characteristics of the project, as well as how to integrate the block, commercial, office, and public landscape land and release vitality, is the most crucial。”

上海临港开发区港城广场

顶级的大规模园区建筑群照明

项目地点|上海港城广场
建设时间|2023年

截至2020年10月,临港新片区建成面积为63平方公里。在临港片区自贸试验区还未设点之前,TS倘思照明就开始参与港城广场的建设之中,历经近6年时间TS负责灯光设计的港城广场项目一二三期已完工,期间,TS团队同时负责了滴水湖活力街区的整体灯光规划。已竣工亮灯的项目面积其占地面积之大,可谓在临港新片区单个项目已建成的最大面积项目。港城广场总建筑面积56万㎡,由8个地块组成的一个完整的街区综合体。TS总设计师钟鸣先生谈到:“在目前顶级的大规模园区建筑群中,如何在夜间用光去凸显企业的文化,地区的开放,以及项目的特色,以及如何融合街区,商业,办公,以及公共景观用地与活力的释放,是最为关键的。”